Labels

Monday, September 10, 2018

SOP for Operation & Maintenance (preventive & breakdown)

SOP for Operation & Maintenance (preventive & breakdown)

Sr. No.
Process Flow
Responsibility
1
All the machines are listed in equipment register and the maintenance plan is prepared. Some of the equipment are under AMC or under warranty or on call basis. This status is mentioned in the equipment register& the label.  
BME
Administrator
2
All the equipment have associated history card.
BME
Administrator
3
At the beginning of the month, the BME/ administrator lists down the equipment which are due for servicing in that month.
BME
Administrator
4
At the convenience of the operator of the equipment, a servicing date is fixed.
BME
Administrator
5
After the equipment is serviced, the operator ensures that the same is working properly and the servicing report is handed over to the administrator.
Administrator
6
The administrator records the details in the relevant register.
Administrator
7
For important equipment a history card is filled mentioning date of servicing done and next due date is put.
Administrator
8
Whenever equipment is malfunctioning or completely stopped functioning, the operator informs the administrator who in turn summons the servicing agency to do the needful.
Administrator
9
After the equipment is repaired the operator ensures that it is back to normalcy and collects and hands over the servicing/repair report to the administrator.
Administrator
10
Suitable entries are made in history card.
Administrator

1 comment:

  1. 'preventative maintenance programs') attempts to help you proactively perform maintenance, repairs, and replacements so that you can prevent failures before they ever have the chance to occur.

    Preventive maintanance plan
    Agaram infotech

    ReplyDelete